Greatest Practices for Useful resource Capability Planning


Useful resource capability planning is among the mostly cited features of undertaking portfolio administration. Senior management rightly desires to know whether or not they have sufficient sources to tackle extra undertaking work and whether or not their current work will get carried out on time. Most corporations acknowledge the shortage of sources to do undertaking work and thereby search for portfolio capability views to reply these two necessary questions:

1) When can we tackle new tasks?
2) Can we get our current work carried out?

As we now have coated in our earlier article, useful resource capability planning might sound easy – evaluate useful resource estimates in opposition to accessible time to work. In observe, nevertheless, it is among the hardest parts of undertaking and portfolio administration to do proper. Firms that may efficiently handle useful resource capability can even successfully optimize their portfolio worth.  On this publish we are going to cowl the most effective practices of the way to get began with useful resource capability planning.

Fast Overview of Useful resource Capability Planning

Useful resource capability planning is about evaluating forecasted useful resource utilization (future-looking view) of undertaking sources in opposition to accessible capability to get undertaking work carried out. Forecasted utilization is the extent of effort a person spends on work (undertaking work, operational work, and so on.) over a course of time. Capability is the usual period of time a person is obtainable to do work.

We are able to additionally differentiate portfolio capability planning from undertaking useful resource planning with easy definitions.

  • Capability planning: targeted on organizational availability (provide and demand) of undertaking sources to get undertaking work carried out.
  • Useful resource planning: targeted on allocating individuals to tasks primarily based on their position and abilities to get work carried out.

In observe, nevertheless, capability planning and useful resource planning should come collectively to successfully handle portfolio-level useful resource capability.

We coated the parts of useful resource capability planning proven within the diagram under in much more element in our different article and video. Now let’s flip our consideration to finest practices on the way to get began with portfolio useful resource administration.

 

Capacity planning and resource management

The Challenge and Portfolio Elements of Useful resource Capability Planning

 

VIDEO: Useful resource Administration Made Simple

 

Greatest Practices in Getting Began with Useful resource Capability Planning

Essentially, useful resource capability planning begins with undertaking planning. As soon as cheap undertaking planning has been carried out, a portfolio administration workforce or PMO can mixture undertaking planning information to judge portfolio stage useful resource capability. On this part we need to overview finest practices associated to undertaking planning and portfolio capability evaluations.

Preliminary Setup – Outline What You Are Measuring

Portfolio useful resource administration requires some up-front setup to get began. Following this, there’s ongoing upkeep and assist, which is roofed under in larger element. Firstly, we are going to define the really useful finest practices for organising useful resource capability planning.

Greatest practices for useful resource capability planning (preliminary course of setup)

  • Outline the useful resource pool: earlier than making an attempt to seize useful resource info for each doable undertaking useful resource, give attention to capturing useful resource estimates to your most important sources. Firms don’t must estimate the useful resource utilization of each undertaking useful resource for each undertaking. In observe, there are often a restricted variety of individuals in excessive demand throughout tasks. These are your vital sources (also called bottleneck sources in relation to vital chain undertaking administration). Capturing the useful resource forecasts for this smaller useful resource pool will nonetheless yield excessive worth with much less effort whereas filtering out the noise. If these vital sources are over-utilized, it usually doesn’t matter if everybody else has availability; these key sources actually management the movement of labor and the power to get undertaking work carried out on time.
  • Outline stage of granularity: we strongly advocate that month-to-month useful resource forecasts be collected on the undertaking stage. Amassing quarterly estimates might not yield adequate information, and most corporations do not need the organizational agility to really make the most of weekly estimates. Moreover, making an attempt to get extra granular information on the activity stage is a waste of time and a nightmare to keep up. Understanding the relative utilization month over month is sweet sufficient. We additionally consider that it’s comparatively simple to establish the named sources engaged on a undertaking. In most cases, it is rather simple to establish the precise individuals of essentially the most vital roles engaged on the undertaking.
  • Carve out operational time: only a few individuals spend 100% of their time on undertaking work, so to get a fairly correct useful resource image, it’s worthwhile to account for the period of time every particular person does operational work (e.g. everyday work, emails, conferences, and so on.).
  • Outline when to gather useful resource info: the preliminary useful resource plan must be developed through the undertaking initiation section (or planning section on the newest). This may occasionally additionally coincide with a Work Consumption course of or Gate Overview course of.

These are the really useful finest practices for getting began with useful resource capability planning at a undertaking stage. The following part will cowl the matter of undertaking planning. There’s one other set of labor to outline the processes for useful resource administration and senior management involvement that will likely be coated within the part on reviewing portfolio useful resource capability.

 

Best Practices for Resource Capacity Planning

Greatest Practices for Useful resource Capability Planning

 

Efficient Challenge Planning

Capability planning relies on efficient undertaking planning. Sound undertaking planning is a finest observe (and important observe) for useful resource capability planning. With a purpose to successfully accumulate the suitable information to handle useful resource capability, organizations should have basic undertaking planning processes in place. These planning processes do not need to be superior or elaborate, however they do have to be constant.

Plan the Work

Efficient undertaking planning requires groups to know what work must be carried out; particularly, what’s in scope and what’s out of scope?  Good undertaking planning requires managing undertaking scope. When undertaking groups don’t perceive the boundaries of their undertaking and what they’re making an attempt to perform, the probability of success decreases. Scope administration is vital for profitable undertaking administration.

 

The primary finest observe in useful resource capability planning is to conduct sufficient undertaking planning; planning processes do not need to be superior or elaborate, however they do have to be constant.

 

Scope planning within the initiation section of a undertaking must be carried out no matter methodology. A undertaking workforce ought to have some high-level understanding of what the undertaking is doing and what it’s not doing. Some corporations consider that Agile undertaking administration implies that this stage of undertaking planning is pointless. Decrease-level options and performance could also be deliberate on the dash stage, however a undertaking workforce must know at some stage of element what they’re creating. Agile undertaking administration just isn’t an excuse to disregard up entrance planning. Scope administration and high-level undertaking planning are finest practices no matter undertaking methodology.

As soon as the scope is effectively understood, groups can start planning main actions. This includes estimating the period and energy of these actions. The extra expertise Challenge Managers and their undertaking groups have with undertaking planning, essentially the most detailed they are often and the extra correct their estimates grow to be. Nonetheless, many corporations do not need sufficient skilled Challenge Managers and may due to this fact give attention to basic practices with out worrying about getting overly detailed estimates.

Estimation is a vital matter even of itself. There are totally different strategies of estimating that undertaking groups ought to be taught to make the most of. The secret is to search out instruments and methods that assist the workforce construct an efficient undertaking plan. Probably the greatest practices of undertaking planning is to get the individuals who will do the precise work to assist with estimation.

Greatest practices for useful resource capability planning (undertaking planning):

  • Conduct constant planning throughout tasks
  • No matter methodology, make clear high-level scope for each undertaking
  • Contain undertaking workforce members in planning and estimation
  • Be taught methods that may assist enhance estimation over time
  • Talk with Useful resource Managers about workforce assignments; by no means depend on software program to interchange good previous communication

Challenge Useful resource Planning

As soon as a undertaking plan is fairly developed with a undertaking schedule; the workforce also needs to develop a undertaking useful resource plan. This includes figuring out which roles are wanted for the undertaking, the precise individuals who will fill these roles, and the quantity of effort wanted throughout a time frame to get the work carried out.

Greatest Practices in Useful resource Capability Planning (Useful resource Granularity)

Challenge useful resource plans don’t have to be as detailed as a undertaking schedule. The truth is, corporations getting began with useful resource capability planning mustn’t attempt to handle detailed useful resource utilization on the activity stage; this can be a lure that corporations fall into. It’s logical to suppose that the extra granular the useful resource estimates are available, the extra correct the information. In actuality, the other finally ends up occurring. As a substitute, have every workforce member estimate their month-to-month forecasted utilization primarily based on their understanding of the work. These top-down useful resource estimates will usually be ‘adequate’ for portfolio stage capability planning. Bear in mind, the purpose is to know relative utilization throughout all tasks within the portfolio with a purpose to reply our two key questions talked about above.

One other advice is to seize named useful resource utilization. Some individuals might advocate that capturing role-based info is ample, however once we attempt to use this information for portfolio capability planning functions, it’s not that helpful. The actual fact is, Challenge Managers ought to know the names of the individuals truly doing the work, so why not seize it? By preserving undertaking useful resource plans on the undertaking or section stage, it makes it simpler to keep up named useful resource forecasts.

Useful resource planning finest practices (undertaking useful resource planning):

  • Hold it easy
  • Estimate useful resource time on the undertaking stage (or section stage if applicable)
  • Don’t attempt to seize granular task-level utilization
  • Don’t attempt to seize skill-based info to start out; figuring out key roles is sweet sufficient to get began
  • Begin with easy ‘top-down’ useful resource forecasts throughout the wanted time-frame and regulate the utilization as wanted (also called useful resource profiling)
  • Month-to-month utilization is usually adequate for portfolio capability planning
  • Don’t attempt to estimate everybody’s time; give attention to these vital sources who’re in excessive demand. This can nonetheless yield excessive worth from a portfolio capability perspective.
  • Useful resource plans must be developed within the initiation or planning phases of a undertaking
  • Throughout undertaking execution, the useful resource plans must be up to date periodically (preserving the useful resource plan easy makes it simpler to keep up)
  • The purpose is ‘good’ information, not ‘excellent’ information

 

Best Practices in Resource Capacity Planning (Resource Granularity)

Portfolio Capability Planning Overview

The toughest work within the capability planning course of is to gather strong useful resource plans throughout all tasks. As soon as these useful resource plans have been created, the subsequent step is to mixture and analyze the information with a purpose to consider the portfolio. Even fundamental capability planning takes effort and time to achieve success. We’ll enable you keep away from frequent pitfalls that organizations run into, however useful resource capability planning nonetheless requires some stage of effort to be helpful and efficient. We’ll have a look at three key roles concerned on the portfolio stage: the Portfolio Supervisor, the Useful resource Supervisor, and the Portfolio Governance workforce. Please notice, that we’ll save our dialog on capability planning instruments till the top.

The Function of the Portfolio Supervisor

Capability planning doesn’t occur by itself. You want somebody who will develop and shepherd the capability planning course of and assist Challenge Managers to create useful resource plans. You additionally want somebody who can analyze the information and supply well timed suggestions to the Portfolio Governance workforce; that is the position of the Portfolio Supervisor.

Whereas the PMO immediately owns undertaking administration processes, the Portfolio Supervisor (or PMO Director) is the method proprietor for the portfolio useful resource administration course of. The Portfolio Supervisor(s) work with the Challenge Administration Workplace (PMO) and the Challenge Managers to mixture useful resource information. This may occasionally require the Portfolio Supervisor to take an administrative position to remind and information the Challenge Managers to develop and replace their useful resource plans in keeping with the method.

The Portfolio Supervisor additionally must have sufficient analytical abilities with a purpose to analyze useful resource information and assess useful resource capability on the portfolio stage. Useful resource evaluation takes into consideration:

The Portfolio Supervisor wants the suitable portfolio-level useful resource charts with a purpose to do useful resource evaluation. Primarily based on this evaluation, the Portfolio Supervisor ought to synthesize present priorities and strategic targets in opposition to useful resource availability with a purpose to develop suggestions that help the Portfolio Governance workforce make higher selections.

Greatest practices for portfolio useful resource administration (Portfolio Supervisor):

  • Establish at the very least one particular person chargeable for coordinating and analyzing useful resource information
  • Give the Portfolio Supervisor oversight of the method
  • Knowledge evaluation abilities
  • Comfortable management abilities for working with Challenge Managers
  • Develop suggestions for the Portfolio Governance workforce primarily based on useful resource evaluation
  • Share useful resource capability evaluation as a part of the portfolio communication plan

 

Many individuals affiliate the necessity for useful resource capability planning with the extra want for time monitoring, considering that they can not measure useful resource capability until in addition they observe time. This is among the commonest misunderstandings with useful resource capability planning. Time monitoring seems to be again to the previous, useful resource planning seems to be ahead to the long run (forecasts); don’t mistake these two.

 

Useful resource Knowledge Evaluation

The purpose of useful resource evaluation is to reply our two key questions: can we tackle new work? And, can we get our current work carried out? The most typical set off for this evaluation is new undertaking requests. Earlier than new undertaking proposals come to the Portfolio Governance workforce, there must be some evaluation on the useful resource impacts because of the new requests to find out whether or not there can be found sources to assist the requests and whether or not current tasks could be negatively impacted. Primarily based on this evaluation, the Portfolio Supervisor could make particular suggestions again to the portfolio governance workforce. Sooner or later, we consider that Synthetic Intelligence (AI) and Machine Studying will assist inform and make suggestions on optimum useful resource utilization.

Resource Capacity Dashboard

Useful resource planning finest practices (Useful resource Knowledge Evaluation):

  • Use easy useful resource utilization classes resembling “Accessible”, “At Threat”, “Over-Utilized”
  • Outline thresholds for when roles and people are “accessible”, “in danger”, or “over-utilized”; this may make the evaluation a lot simpler.
  • Begin by trying on the over-utilized roles after which drill right down to particular individuals. It’s doable for a workforce to be over-utilized but have at the very least one one who can tackle extra work (this often implies that another person has an excessive amount of work that must be re-assigned).
  • Useful resource groups with a mean utilization that places them “in danger” or “over-utilized” represents a actual useful resource threat to the portfolio.
  • Hold it easy; filter out noise by specializing in key useful resource roles and some particular people; an excessive amount of information will over-complicate useful resource evaluation.

The Function of the Useful resource Supervisor

A Useful resource Supervisor is usually a first-level supervisor chargeable for a workforce of people that is chargeable for sustaining oversight of the workforce and allocating them to undertaking and directing operational work. In lots of circumstances, earlier than a person can assist a undertaking, the Useful resource Supervisor has to approve the task. Therefore, the Useful resource Supervisor has an necessary position in useful resource plans and capability planning normally.

Greatest practices for useful resource capability planning (Useful resource Supervisor):

  • Speak with Challenge Managers in regards to the scope of undertaking work
  • Speak with sources in your workforce to match abilities and curiosity with the undertaking
  • Monitor operational work to your workforce to assist decide undertaking capability

Joint Capability Evaluations

Joint useful resource capability evaluations are an rising finest observe for managing useful resource capability. Joint Capability Overview conferences contain the Portfolio Supervisor with key Useful resource Managers to overview upcoming undertaking proposals that may influence useful resource capability. The aim of the assembly is to judge potential impacts and generate suggestions again to the Portfolio Governance Staff. In observe, the Portfolio Governance Staff doesn’t have the time to research and sift by means of the huge quantities of useful resource information. As a substitute, the Portfolio Supervisor ought to have carried out some evaluation previous to a Joint Capability Overview assembly to focus on anticipated bottlenecks and over-utilization primarily based on incoming undertaking proposals. The Portfolio Supervisor with the Useful resource Managers can collectively develop a number of key suggestions to help the Portfolio Governance Staff with making the suitable portfolio selections. The Useful resource Managers should not the ultimate determination makers, however are shut sufficient to the work to develop strong suggestions for the Portfolio Governance Staff to overview. By offering a restricted set of suggestions, governance conferences are extra environment friendly and higher selections are made.

The Function of the Portfolio Governance Staff

The senior leaders on the Portfolio Governance workforce are those to make key selections in regards to the portfolio. These selections focus on: approving new tasks (Work Consumption), gate evaluations (Part-Gate), prioritization, and portfolio planning (together with managing undertaking interdependencies). Useful resource capability is a significant enter to those selections. The Portfolio Governance workforce ought to solely approve tasks primarily based on precedence and useful resource availability. That is one motive why Work Consumption course of is so vital to creating portfolio administration work.

Usually, don’t merely share useful resource capability info with the Portfolio Governance workforce. These senior leaders do not need the time to review the information and won’t usually be capable of synthesize the data throughout a governance assembly. As a substitute, present choices for them to pick out and allow them to focus on and determine the most effective motion to take primarily based on the data offered. There are a number of basic actions the Portfolio Governance workforce can take to handle over-utilized sources:

  • Proactively re-negotiate new completion dates (regulate undertaking/portfolio schedules)
  • Rent extra sources (regulate portfolio funds)
  • Put decrease precedence work on maintain (or defer) to liberate useful resource time or cease new tasks from coming into the portfolio (regulate portfolio scope)
  • Do nothing (settle for over-utilization and ask groups to work round it)

 

Portfolio resource management options

 

The most effective strategy is for the Portfolio Governance workforce to make sure that sources can be found when approving new tasks. This protects useful resource capability and protects portfolio supply.

Greatest practices for useful resource capability planning (Portfolio Governance Staff):

  • Make the most of useful resource capability info throughout key decision-making conferences resembling reviewing new proposals or Part-Gate evaluations
  • Let the Portfolio Governance workforce overview choices primarily based on useful resource capability info with a purpose to make higher selections

Outline the Course of and Timing for Collectively Reviewing Useful resource Info

With a purpose to make the useful resource administration course of run extra easily, outline the method for collectively reviewing useful resource info with the PMO, Useful resource Managers, and Challenge Managers earlier than sharing this with the Portfolio Governance workforce. That is an rising finest observe for useful resource capability planning to make sure that managers and senior leaders have well timed visibility of useful resource information. Structuring your undertaking overview course of in order that there are a number of tasks to overview will truly assist with establishing useful resource capability planning, as a result of Senior Leaders must overview a number of tasks at one time. Moreover, a periodic useful resource planning assembly with impacted Useful resource Managers can present well timed collaboration and assist floor useful resource dangers (and options) earlier than assembly with the Portfolio Governance workforce.

Greatest practices for useful resource capability planning (well timed evaluations):

  • Set up a daily time to fulfill with Useful resource Managers to collectively overview undertaking useful resource info
  • Let Useful resource Managers regulate estimates primarily based on different work that is occurring (i.e. regulate estimates primarily based on their understanding of undertaking priorities)
  • Use the conferences to assist plan when sources will likely be accessible to start out new work

A Phrase About Time Monitoring

Many individuals affiliate the necessity for useful resource capability planning with the extra want for time monitoring, considering that they can not measure useful resource capability until in addition they observe time. This is among the commonest misunderstandings with useful resource capability planning. Time monitoring seems to be again to the previous, useful resource planning seems to be ahead to the long run (forecasts); don’t mistake these two.

There are reliable causes to trace time, however your group doesn’t have to trace time with a purpose to start assessing useful resource capability on the portfolio stage.

One other frequent fable is that point monitoring will assist enhance future estimates. Only a few corporations have the luxurious of going again after a number of months on a undertaking to check their forecasts with the precise time spent. Except you observe time on the activity stage, it’s not possible going to assist enhance forecasting. There are different instruments and methods that groups can make the most of to enhance forecasts (e.g. planning poker).

One space the place time monitoring might be efficient is to trace how a lot time is spent on operational work. With this information you’ll be able to then decide what the precise undertaking availability is for people and groups. I’ve utilized a 6-month shifting common to operational time with a purpose to estimate precise undertaking availability. I noticed one different Tech firm apply this method efficiently as effectively.

Useful resource Capability Planning Software program and Instruments

This final part covers the instruments for efficient useful resource capability planning. We’ll evaluate frequent spreadsheets with devoted portfolio administration software program.

Spreadsheets for Useful resource Capability Planning

The quick reply is – don’t use spreadsheets for useful resource capability planning. Watch our video on the challenges of utilizing spreadsheets for undertaking portfolio administration to be taught extra. There are vital challenges with using any spreadsheet. With a VERY small set of useful resource information, you’ll be able to observe a number of key workforce members throughout tasks, however with no devoted PPM software program answer, it will likely be troublesome to research and pivot the information to get the data you want.

Handle Useful resource Capability with Acuity PPM Challenge Portfolio Administration Software program

Most undertaking portfolio administration software program will can help you seize useful resource information and analyze useful resource capability. Many devoted undertaking administration instruments is not going to can help you do that throughout the portfolio, which is why portfolio administration software program is effective. Nonetheless, some portfolio useful resource administration software program is troublesome to make use of and comes with a poor person expertise. You do not want advanced PPM software program with a purpose to get began with portfolio useful resource administration. Most organizations will profit from light-weight PPM software program resembling Acuity PPM. Acuity PPM is a wonderful light-weight undertaking portfolio administration answer that replaces spreadsheets. Acuity PPM helps you observe undertaking efficiency, report undertaking and portfolio standing to senior leaders, handle and prioritize incoming undertaking requests, visualize strategic roadmaps, allocate sources and handle useful resource capability. All of this helps allow strategic agility in a altering surroundings. The Acuity PPM useful resource administration module allows you to arrange a useful resource pool, create undertaking stage useful resource plans, assign workforce members, and mixture useful resource information to the portfolio stage.

 

Resource Management Software

 

A useful resource capability planning device will enable you higher handle sources on the portfolio stage. Take into account that some options will likely be extra person pleasant than others. Some PPM options required in-depth useful resource monitoring and may solely be used in case you are a sophisticated and mature PMO. In any other case, for organizations getting began, light-weight PPM software program just isn’t solely sufficient however it would rapidly enable you make progress.

Greatest practices for useful resource capability planning (useful resource capability planning instruments):

  • Hold it easy
  • Use a useful resource dashboard to rapidly establish what number of groups can be found, in danger, or over-utilized
  • Seize useful resource plans on the undertaking stage (or section stage)
  • Use a warmth map to rapidly establish months which are in danger or over-utilize

 

How Synthetic Intelligence Will Impression Portfolio Useful resource Administration

Synthetic intelligence (AI) may have a significant influence on a corporation’s capacity to handle useful resource capability. Typically talking, most corporations do not need sufficient expert analysts to research useful resource capability and assist make suggestions. Some organizations don’t even have sufficient Challenge Managers, not to mention Portfolio Analysts skilled and geared up to do in-depth useful resource administration. Synthetic intelligence will open up new evaluation potentialities for a lot of organizations to get assist alerting PMO Administrators and the portfolio governance workforce about over-utilized sources and the way to tackle the difficulty. Synthetic intelligence will assist make higher suggestions through the Work Consumption course of in order that groups should not over-utilized. Furthermore, as AI improves, true portfolio optimization and useful resource optimization will likely be made doable.

 

Schedule A Demo

 

 

What’s the distinction between capability planning and useful resource planning?

Capability planning is targeted on organizational availability (provide and demand) of undertaking sources to get undertaking work carried out. Useful resource planning is targeted on allocating individuals to tasks primarily based on their position and abilities to get work carried out.

What are useful resource capability planning finest practices associated to undertaking administration?

Conduct constant planning throughout tasks; no matter methodology, make clear high-level scope for each undertaking; contain undertaking workforce members in planning and estimation; be taught methods that may assist enhance estimation over time; talk with Useful resource Managers about workforce assignments; by no means depend on software program to interchange good previous communication.

What are finest practices associated to undertaking useful resource planning?


Best Practices in Resource Capacity Planning (Resource Granularity)

Hold it easy; Estimate useful resource time on the undertaking stage (or section stage if applicable); Don’t attempt to seize granular task-level utilization; Don’t attempt to seize skill-based info to start out; figuring out key roles is sweet sufficient to get began; Begin with easy ‘top-down’ useful resource forecasts throughout the wanted time-frame and regulate the utilization as wanted (also called useful resource profiling); Month-to-month utilization is usually adequate for portfolio capability planning; Don’t attempt to estimate everybody’s time; give attention to these vital sources who’re in excessive demand. This can nonetheless yield excessive worth from a portfolio capability perspective; Useful resource plans must be developed within the initiation or planning phases of a undertaking; Throughout undertaking execution, the useful resource plans must be up to date periodically (preserving the useful resource plan easy makes it simpler to keep up); The purpose is ‘good’ information, not ‘excellent’ information.

What are finest practices associated to useful resource capability information evaluation?


Resource Capacity Dashboard

Use easy useful resource utilization classes resembling “Accessible”, “At Threat”, “Over-Utilized”; Outline thresholds for when roles and people are “accessible”, “in danger”, or “over-utilized”; this may make the evaluation a lot simpler; Begin by trying on the over-utilized roles after which drill right down to particular individuals. It’s doable for a workforce to be over-utilized but have at the very least one one who can tackle extra work (this often implies that another person has an excessive amount of work that must be re-assigned); Useful resource groups with a mean utilization that places them “in danger” or “over-utilized” represents an actual useful resource threat to the portfolio; Hold it easy; filter out noise by specializing in key useful resource roles and some particular people; an excessive amount of information will over-complicate useful resource evaluation.

If you're looking to gain clarity, accelerate growth, or overcome strategic roadblocks, now is the time to act.

Schedule a personalized consultation with Michael Tribble at michael.tribble5@gmail.com and discover how Projectwise Consulting can help you move forward with purpose and precision.

Whether you prefer a quick call or a direct text, Michael Tribble is available to connect at your convenience.

Visit Projectwise-Consulting.com to learn more and book your session online.

Want to connect professionally?
Reach out on LinkedIn: Michael Tribble: https://www.linkedin.com/in/michael-a-tribble